Welcome to Shenzhen Chuangxing Construction Co., Ltd!

Copyright © 2020 Shenzhen Chuangxing Construction Co., Ltd, All Rights Reserved.  粤ICP备24578123号 

  • Chinese
  • img

    Scan QR code,

    attentionChong Hing Buildingthe public

    img
  • img

Appreciate

>
Business_details

Weak current

1 computer room with an area of 80㎡, including fire protection system, power distribution system, environmental control system, lightning protection grounding system, and computer room wiring. The minimum load capacity of the UPS system is 30KVA, 2 sets, 2 sets of external storage batteries, 30 1KVA UPS; 1 core switch, 1 engine, 2 aggregation switches, 34 access switches, 1 firewall, 1 fiber optic disk array, 1 server; comprehensive unlimited horizontal trunking of 2500 meters, outdoor 6-core multimode fiber 3300m, 200 Outdoor waterproof telephone cable 600m, 200 pairs indoor telephone cable 700m, 100 pairs indoor telephone cable 1300m; 900 network points, 900 telephone points, 900 power points, 1 wireless system main controller, wireless AP66 group .
没有此类产品
Description

1 computer room with an area of 80㎡, including fire protection system, power distribution system, environmental control system, lightning protection grounding system, and computer room wiring. The minimum load capacity of the UPS system is 30KVA, 2 sets, 2 sets of external storage batteries, 30 1KVA UPS; 1 core switch, 1 engine, 2 aggregation switches, 34 access switches, 1 firewall, 1 fiber optic disk array, 1 server; comprehensive unlimited horizontal trunking of 2500 meters, outdoor 6-core multimode fiber 3300m, 200 Outdoor waterproof telephone cable 600m, 200 pairs indoor telephone cable 700m, 100 pairs indoor telephone cable 1300m; 900 network points, 900 telephone points, 900 power points, 1 wireless system main controller, wireless AP66 group .

Corresponding parameter set not found, please add it in property template of background
暂未实现,敬请期待
暂未实现,敬请期待
Previous article
Next article